One charger used from two parking positions
Show both spaces and any walking route between them. Equipment capability, cable storage and electrical supply should be considered alongside convenient mounting.
Can one position serve both vehicles conveniently?
Serving two parking positions from one unit is different from charging two vehicles at the same time. The owner should decide whether the goal is convenient alternate use or simultaneous charging, because those requests can involve different equipment and supply arrangements.
For alternate use, assess approved cable reach and storage at both positions. For simultaneous use, compare the selected products and any supported sharing arrangement rather than assume a longer cable provides another charging connection. The estimate should state which operation it supplies and any limitations, leaving a possible second installation separate from today's usable system.
Details to include with this request
- Both parking positions
- Vehicle port locations
- Charger cable information
Questions about MKB Electric
Does MKB Electric provide EV charger installation in South Salem?
Yes. MKB Electric serves South Salem and provides EV charger installation as part of its residential electrical services.
How is an EV charger installation evaluated?
MKB reviews the existing electrical system, the requested work, equipment requirements and installation conditions before finalizing the scope.
Who will I deal with on the project?
MKB Electric is owner-operated, so customers communicate directly with the owner about estimating, planning and the electrical work.
Are permits or inspections required?
Requirements depend on the exact project and municipality. MKB confirms applicable requirements for the property before work begins. Westchester County Master Electrician License #2159.
